Source: Date:2014-11-07
![]() |
|
The main bridge is a rigid frame with continuous PC box girder, and the span arrangement is 123.6+170+123.6m. The total length of the bridge is 1,126m and the quantity of concrete of box girder is 14,190m3. The bridge was commenced in 1997 and completed in 2001. |
up:
next:

