Today:
首页 > English > Products and Services > Brilliant Experience > Bridge Works

Shifeng Bridge in Zhuzhou

Source:    Date:2014-11-07  

The total length of the bridge is 1,818m, consisting of 11 spans, the main bridge deck on RC box-ribbed arch. Total concrete used is about 100,000m3.
The bridge was commenced in 1999 and completed in 2002.

up:

next: