Source: Date:2014-11-07
![]() |
|
The total length of the bridge is 1,818m, consisting of 11 spans, the main bridge deck on RC box-ribbed arch. Total concrete used is about 100,000m3. The bridge was commenced in 1999 and completed in 2002. |
up:
next:

